Wednesday, August 26, 2009

Start at the bottom


Start at the bottom
Originally uploaded by Sadlr

Back to work and into a new project. The hold of the sailing barge 'Ora et Labora' has been stripped down to the asphalt ballast and here we are setting up the new floor beams. Peter, multi-talented lad that he is, chips away a bit of ballast with a pneumatic hammer so that we can get the floor parallel to the keel plank.