The bathroom is ready for its epoxy and glass mat finishing layer. Another job for Gerrit Heerema.
All I have to do is drill a large hole for the shower drain through the new 5 mm steel floor.
Procrastination is the order of the day.
Woodwork, barges, lasers, optimists and anything else that might cross my path.